PVA Ueckermünde

The roof system is divided into four roofs with approximately in total 8,000 square meters on an old brick factory, which is now used as a boat shelter. Modules and inverters are led by six sub-distributions on a main central distribution and coupled thereto by a transformer to the medium voltage grid.

Power: 871 kWp - 3.700 Panels
Panels: Schüco, 240 Wp
Inverters: REFUsol (43 St.)
Mounting System: MP-Tec
Electrical Engineering: TSP - Riess GmbH & Co. KG
Construction time including planning: 15 days